.
E: info@gbspecialistaccess.co.uk - London: 020 335 54311 Birmingham: 012 181 61559

HS1 Stratford International Station

We provided a reinforced concrete frame and associated piled foundations for a 24-unit apartment block to be constructed. The project involved diversion of existing drainage network, reinforced concrete pile cap and ground beam and RC frame construction to the first-floor podium slab.